Inspection Chamber Riser - 200mm Height x 300mm Diameter

In stock
Code
D822
From 8 reviews
More Information
Code D822
EAN Code 5055149907715
Weight (kg) 1.386000
Brand FloPlast
Colour Black
Material PVC
Dimension 200mm (H) x 300mm (Diameter)
Guarantee 10 Year Manufacturer Guarantee
Specification BS 7158
Size 200mm Height x 300mm Diameter
£34.14 £28.45
You need to spend another £250.00 to qualify for 2.5% discount.

This 200mm chamber riser is used in conjunction with our D800, D801 and D802 and D810 chamber bases to form a mini inspection chamber.

The diameter of this riser, which has an integral seal, is 300mm and the effective height is 200mm. The riser can be cut down to either 60mm,100mm or 150mm if required using any standard fine-toothed saw.

As 300mm chambers are narrow in nature, they are only practicable for use to a maximum invert depth of 600mm.

Inspection Chamber Components

Whilst most customers generally order inspection chambers as sets (base, risers and cover) there are often occasions when it is easier to order the chamber in its individual components. This allows for greater flexibility on site, for example where the final drainage layout is likely to differ from that suggested in the plans, or where the finished ground levels are subject to change.

All of these components can be interchanged with the relevant chamber sets, so if you are simply looking for an additional riser then you are in the right place! Just make sure that the manufacturers of each are the same, as chamber bases and risers from different manufacturers are rarely interchangeable.

All of our inspection chamber components are sourced from reputable supplier partners who are leaders in the UK market such as ClarkDrain and FloPlast.

Inspection chambers are a vital part of the underground drainage system, whether it be residential or commercial. They are necessary to provide access into various key points of the underground drainage system. Such access points are used for maintenance tasks such as inspecting and testing pipes to ensure that effluent is flowing correctly and to clear any potential blockages with drain rods or high pressure jetting as required.